PK Homes Procedures


How to Save Money Building
Prestige Kit Homes procedures are as follows:

  1. You email or post us your design, or we can supply you with a design that suits your needs. To get an accurate quote we will require your wind rating, BAL rating, and whether you wish for timber or steel. We will contact you if more information is required.
  2. We will provide a transparent quote where we will give you an itemized free quote on each of the 4 stages: There are no grey areas on what we are supplying and what we are not supplying .
  3. The 4 stages are Floor Kit, Lockup Kit, Lining Kit, Final Kit.
  4. If you are happy with our quote, we will then draw up your contract for you to sign, that matches your quote.
  5. We offer 2 options when deciding on your home design and / payment , and they are (a) Pay 5 % of the contract price and receive a basic floor plan and front elevation only. OR (b) Pay 10 % of the contract price and receive detailed floor plans with elevations, engineering and your energy report, all ready to submit to council.
  6. We will then send them to you (This is your 1st prelim) so that you can have a look through them and check to see if you are happy with all aspects of your plans. If you require changes we will make the changes at no cost to you (this does not include any extra materials that are required)
  7. We will then resend them to you after the changes have been made. If you require more changes there is stillĀ  no cost to you (this does not include any extra materials that are required)
  8. All changes of the plans after the 2nd prelim are charged at $250.00 per prelim until the customer is happy with them and signs off on the plan. Once you are 100% happy with the plans, they then become your final plans, and we have the necessary engineering carried out as well as your energy report.
  9. Six copies of your final plans are sent to you as well as copies of any engineering and the energy report. These are also emailed to you.
  10. You then submit these to your local council for approval.
  11. Once you have council approval, and you have decided on your delivery date, we will require a further payment of 35% of your contract price. This will enable the detailing, manufacturing of your frames, trusses and floor system. As well as ordering all your roofing, windows, cladding, external doors and roofing blanket etc.
  12. Prior to any deliveries the balance of the contract (55%) is paid.
  13. Once the final payment is made, delivery of the materials are sent to the site.
  14. The owner then checks off all materials and emails the results back to Prestige Kit Homes.
  15. During the building process Prestige Kit Homes will keep in touch with the build progress.
  16. If the lining kit is purchased Prestige Kit Homes requires at least 7 to 10 days prior to delivery of plaster.
  17. If the final kit is purchased Prestige Kit Homes requires 3 to 4 weeks for delivery of all items.